Search entries


 

 

 
    
    
    
Year
from till

 

Found 1 entry.


1

1.

50662

Preliminary study on design demands at the connection between a cold water pipe and a floating OTEC plant

Assenberg, M.F., 2015

Digital version: 3.1 MB

1